Timeframe

From Mirror Swarm
Revision as of 12:03, 3 January 2020 by John (talk | contribs) (→‎Strategy)
Jump to navigation Jump to search

Kurzgesagt says the exponential phase of mirror deployment can be accomplished over a ten year period, so. Let's work backwards.

  • 2040 deployment complete, mirror swarm online and sending at full power.
  • 2030 deployment started, deployment test phase begins.
  • 2029 sponsored launch.
  • 2027 plans finalized, sponsors in place, product assembly begins.
  • 2026
  • 2025 unit testing started
  • 2024
  • 2023
  • 2022
  • 2021 management structure in place, team structures tested
  • 2020 mirrorswarm.com registered, planning starts.

Strategy

started John (talk) 11:59, 3 January 2020 (UTC)

  • An emergent team structure driven by progressive analysis of the requirement.
  • A long-term management structure aimed at retaining control of the swarm to oversee compliance with the constraints, initially achieved by Jowan's voting control. This start-up direction model is Benevolent Dictator.
  • Make it work on paper before anyone takes out a screwdriver.
  • Small project teams
  • Rapid prototyping
  • High transparency
  • Asynchronous cooperation
  • Webinar meetings and conferences for documentation and open access
  • Actively avoid back channels, leave a documentation trail
  • Avoid proprietary or patented technology where it is applicable.
  • Early access to spin-off open source technology will attract business participants