Timeframe: Difference between revisions

From Mirror Swarm
Jump to navigation Jump to search
(Created page with "Kurzgesagt says the exponential phase of mirror deployment can be accomplished over a ten year period, so. Let's work backwards. *2040 deployment complete, mirror swarm onlin...")
 
No edit summary
Line 13: Line 13:
*2020 mirrorswarm.com registered, planning starts.
*2020 mirrorswarm.com registered, planning starts.


An emergent team structure driven by the progressive analysis of the requirement.
*An emergent team structure driven by the progressive analysis of the requirement.
A long-term management structure aimed at retaining command control of the swarm to oversee compliance with the constraints.
*A long-term management structure aimed at retaining command control of the swarm to oversee compliance with the constraints.
Get it working on paper before anyone takes out a screwdriver.
*Get it working on paper before anyone takes out a screwdriver.

Revision as of 23:50, 2 January 2020

Kurzgesagt says the exponential phase of mirror deployment can be accomplished over a ten year period, so. Let's work backwards.

  • 2040 deployment complete, mirror swarm online and sending at full power.
  • 2030 deployment started, deployment test phase begins.
  • 2029 sponsored launch.
  • 2027 plans finalized, sponsors in place, product assembly begins.
  • 2026
  • 2025 unit testing started
  • 2024
  • 2023
  • 2022
  • 2021 management structure in place, team structures tested
  • 2020 mirrorswarm.com registered, planning starts.
  • An emergent team structure driven by the progressive analysis of the requirement.
  • A long-term management structure aimed at retaining command control of the swarm to oversee compliance with the constraints.
  • Get it working on paper before anyone takes out a screwdriver.