Cost: Difference between revisions

From Mirror Swarm
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 5: Line 5:
The wiki and forum are at Concept Maturity Level 1 (Cocktail Napkin: Defined objectives and approaches, basic architecture concept) and developing toward a Concept Maturity Level 2 state (Initial feasibility: Physics works, ballpark mass and cost).
The wiki and forum are at Concept Maturity Level 1 (Cocktail Napkin: Defined objectives and approaches, basic architecture concept) and developing toward a Concept Maturity Level 2 state (Initial feasibility: Physics works, ballpark mass and cost).


The current estimate - see the spreadsheet - is around FY20£M 500. This figure indicates the scale of investment required before the swarm is up to full power.
The current estimate - [https://mirrorswarm.com/forum/download/file.php?id=4 see the spreadsheet] - is around FY20£M 500. This figure indicates the scale of investment required before the swarm is up to full power.


Cost to date (JAN 2020): FY20£ 75.
Cost to date (JAN 2020): FY20£ 75.

Latest revision as of 19:58, 20 January 2020

This projection is necessarily in flux.

All accounting is in Financial year 2020 UKP UK (£:pounds) indicated as FY20£.

The wiki and forum are at Concept Maturity Level 1 (Cocktail Napkin: Defined objectives and approaches, basic architecture concept) and developing toward a Concept Maturity Level 2 state (Initial feasibility: Physics works, ballpark mass and cost).

The current estimate - see the spreadsheet - is around FY20£M 500. This figure indicates the scale of investment required before the swarm is up to full power.

Cost to date (JAN 2020): FY20£ 75.