An outline of requirements
Posted: Sun Jan 12, 2020 12:54 pm
design a hardware fabrication package ("fab") to carry a bootstrap supply of refiners, builders, power generation, power distribution
design a control centre
specify and design surface remediation for the site once the swarm is deployed
when it all works on paper, build the fab and control centre. Outsource communications hardware
staff the control centre
deliver the fab to the Mercury site
implement surface remediation of site
put the site into maintenance mode to recycle ground-systems and mirrors
design a control centre
specify and design surface remediation for the site once the swarm is deployed
when it all works on paper, build the fab and control centre. Outsource communications hardware
staff the control centre
deliver the fab to the Mercury site
- deploy bootstrap resources and begin refining
- deploy local-made refineries and builders
- build ground-based power generators
- build railgun
- build power storage
- build zero-G factories making host-orbit mirrors
- build matching power receivers
- start railgun delivery to orbit
- build v2 railgun
- build v2 power storage
- build v2 zero-G factories making solar-orbit mirrors
- build matching power receivers
- start v2 railgun delivery to orbit
implement surface remediation of site
put the site into maintenance mode to recycle ground-systems and mirrors